Project 1 : Cargo Village (Damascus – Syria)


700 m2 buildings & 8000 m2 roads& yards including electro mechanical and sanitary installation.
The project was executed by CEC on a cost plus bases.
The cost came to about 4500000 USD.
 

 

Top

 

Project 2 : Microwave Telecommunication Infra Structure


This project consist of design, construction and erection of telecommunication steel tower including site survey – foundation – galvanized steel – procurement – painting – earthing – lightning protection – air warning lights – antenna support and erection.

 

Top

 

Project 3 : GSM Infra Structure


CEC design, manufacture and erect roof masts and green field towers for mounting GSM antennas.
The duties also include connection all fittings from wave guide to the sheltered machines in addition to foundation – earthing – lightning protection – AWL - erection – painting.
 

 

Top

 

Project 4 : Al-Furat Petroleum Projects


CEC was the subcontractor of Stork Engineers & Contractors B.V. in the period between 1998 – 2002. All civil work steel structure, pipe supports and other related works performed by CEC.

Top

 

Project 5 : Sludge Tanks for Damascus Sewage Plant


The project consisted of 6 sludge tanks 28m diameter and same in height plus 1 gas holder tank of 33m and on puffer tank of 18m. All in post tensioned concrete and all required high degree of impermeability especially the conical roof of the sludge tanks which has about 30o inclination and required impermeability unlined concrete under pressure gas.

 


 


 


 

   

Top

 

Project 6 : Restoration of Damascus Main office Building


The building which was founded on piles suffered during the last 50 years from heavy shear cracks due to different settlement and also consequently partial compression failure of the columns.
The building was under pained by jet grouting column (with STFA-Istanbul – Turkey) and all the structural was strengthened to resist normal and seismic load.
The value of this project is about 3000000 USD.

Top

 

Project 7 : Restoration of Al Mutanbi Banquit Hall – Meridien Hotel in Damascus


This hall of 1500m2 had 12 supporting column in the third of the 30m span. CEC has designed a support system to the ceiling and removed the 12 columns and then redecorated the ceiling of the hall installing also all electromechanical systems.
The value of this project is about 2000000 USD.


 

Top

 

Project 8 : Mashta El Helou Hotel and Resort



The client is the company which carries the same name. CEC execution of the structure and co-managed the execution of finishing works (with partnership of B.L. Yacoubian Contractors).
The value of the projects is about 7000000 USD.


 

Top


 

Project 9 : Underpinning


The Dummar district in Damascus is founded on marl which looses it’s bond which submerged in water and because of the hilly nature of the site, neighboring column foundation are generally not on the same level and because they are not confined tend to settle when they are attached by water and the column is then subject to great tensile force to supply such column.
CEC after some research works developed and underpinning design penetration the foundation and transferring the load to the depth. The design provide efficient and safe.

Top

 

 

Project 10 : To Jaica Company

 

Report Studies Guiding to Feasibility Studies
  1. Survey on Present Water Use and Household Income in Damascus City
    August 1996.
  2. Report on Supplementary Topographic & Leveling Surveys for the Study of Development of Water Supply     System for Damascus city  June 1997.
  3. Survey on Present Water Use in Lawan and Mezze – Razy July 1997.
  4. Report on Supplementary Topographic & Leveling Surveys for the Study of Development of Water Supply
  5. System for Damascus city July 1997.
  6. The study on Urban Transportation Planning of Damascus city in the Syrian Arab Republic March 1998.
  7. Initial Environmental Examination (IEE) on the Study on Urban Transportation Planning of Damascus city
    August 1998.
  8. Environmental Impact Assessment (EIA) on the Study on Urban Transportation Planning of Damascus city
    December 1998.
  9. Development of Water Resources in the Central and South Western Basins in the Syrian Arab Republic
    January ‏1999.

Top

 